Pages

Friday, September 23, 2011

Basement Living Room... (LONG & PIC HEAVY)

21 months ago, we embarked on a bit of renovation around this here house. Due to having a home based business, (most recent reference here) and because said business requires a bunch of space set aside, in my opinion, for the ease and function of day to day activities, we were without a living space for a few months in late 2009. To fix this problem we decided to renovate our mostly un-finished basement.

One good thing about a ranch-style house, at least ours, is that the basement runs the entire length & width of the main floor. So, renovating the space, not only netted us a new living room space, 2nd bathroom and dedicated laundry space, but also doubled our home's square footage. We opted to hire a contractor to do the renovation mainly because we were moving plumbing, adding plumbing and a sewage pump, as well as an exterior exit and new electrical. And, even though I think we could have handled a LOT of the work, we are very inexperienced and frankly wanted a quicker result than self-renovation could have afforded.

I do not have any pictures of what the basement looked like prior to demolition or the renovation. In fact I don't even have any good pictures of what it looked like AFTER the renovation was completed and we furnished and were living in the space full time.

**Smacks forehead in frustration!**

Anyways...this month of September, while also being my birthday month (which was YAY!) was one of upheavals in the H household. We experienced Hurricane Irene and the loss of power for about 12 hours, which I thought at the time was horrendous. We know others were out much longer and/or sustained MUCH more damage and inconvenience than we did, so no big for us. But we also received the rains and storms of  stalled & land-fallen Tropical Storm Lee.  So, long story short, onto already swollen and rain-soggy ground we received over 13 inches of rain between September 4 & September 9. Which resulted in flash flooding,
Our Mailbox, right in front of our house.

Our backyard "pool"
which was scary here at our house, and severe flooding of both the Susquehanna river and nearby creeks and streams. The creek which pretty much flows through every township, borough and near every neighborhood near me, normally floods at 7 1/2 feet. As of Friday 9/9 the creek crested at over 26'. Needless to say, the damages we've sustained here in our area of the world aren't something we're used to and according to neighbors and older generations haven't been seen since 1972 & Tropical Storm Agnes.

***I want to point out and make VERY clear, that we are supremely lucky that we have only had the damages we've had. Everyone in our families are safe, and most of us have only sustained minor damage to our homes. My husband's one sister has sustained major flood damage to her home, so she and her family are currently living elsewhere and may never be able to return to their home. (In fact...their home filled up to over 2 ft on their first floor, and the area around the house flooded so quickly they were stranded on their 2nd floor and had to be rescued by helicopter. We know we are very lucky, and we are grateful everyone we love is safe.) Last I heard, it was being inspected to determine if the home is even salvageable. We know there are those around us who are dealing with much worse than we and weren't so lucky in having all in their friends and family survive safe and sound. We pray for everyone who was lost and those dealing with supreme damages and loss to rebound quickly.***

We were also lucky in that we did not receive any flood waters into the house...truth be told, we felt like an island for most of Wednesday, 9/7/11.

We thought we were going to be spared. In the end, we were not. The water table underground rose so dramatically we unfortunately started experiencing groundwater seepage from under our basement floor. Hubby woke up around 2 am Thursday 9/8 and noticed that we had about 6" of water on the outside of our exterior basement door. 
Where it all started.
At first we thought it was isolated to right there. Little did we know, the water was all over the basement.

Starting to come up around the edges
See, we had sprung for the premium under padding for our carpeting, which had a layer of waterproof plastic that laid against the floor. Great we thought for softness underfoot, protection against minor water under the floor, etc. It turned out, Water was accumulating under our carpet padding, but wasn't able to seep through due to the extreme water-resistant properties of the under padding. Sweet! Unfortunately, we didn't realize this completely ~Can I blame sleeplessness?~ and proceeded to walk all over the carpet, placing furniture up high, and removing extremely valuable pieces, "just in case" or so we thought at the time.

preservation mode @ 2am; you can 'sort of' see the gist of our remodel
 
By the afternoon of Thursday, though we realized that we had 6" of water in the entire basement and we needed to do more than just place things up higher, but actually move our furniture and items to the first floor. Needless to say the carpeting was ruined and so were our baseboards and roughly 6 inches of drywall.

We are so very frustrated and were very overwhelmed with the feelings of futility. Although, again, we know we have it MUCH better than scores of others, we are still left with some very disappointing clean-up and a long road to remodeling ahead. We proceeded to use a service to come and pump out the water, because we did not really think long and hard about it, could not find a pump and thought that getting the water out quickly was paramount to saving our freshly new living space. The service came and left with less than 1/2" water remaining. We were astounded to see within 30 minutes of their departure, 6" of water returned to the basement. Of course, we thought. I couldn't ever be that easy. We were able to find a utility pump on Friday afternoon and again proceeded to pump ourselves out. Again, the water returned, although this time it was within a few hours. Woohoo...progress I guess! All in all, we pumped ourselves out 3 times over the course of 4 days and finally by Sunday we had all the water out. During this time, we were able to move 98% of our belongings and furniture, and remove 100% of the carpeting that covered 75% of our basement floors.
Carpet Mountain
The next week was all about clean-up. We needed to cut away drywall, remove baseboards and try to prevent mold growth. We cut 2 feet-ish of drywall off the walls to make sure we got all the soggy material that is such a breeding ground for that nasty M-word. We also sprayed and sprayed and sprayed a bleach solution all over the damp floors and wood framing to hopefully kill anything that may or may not have begun growing. Between work and life, it took us, hubby's dad, and our neighbor's son a full week to accomplish.
 Now, we are in dry-out mode.
2 dehumidifiers plus 2 fans running non-stop
We are drywall-less on the lower 1/3 of walls and mostly cleaned up.

Hubby's new perch for Gears of War3

bad lighting, and all my pretty carpet is gone
Anyone need to go potty?

We need at least another full week of drying time to make sure the framing and everything behind the drywall is nice and dry and mold-free.

Then begins the slow process to return the space into at least a fraction of what it once was. ~which unfortunately, I failed to photo document. Oh memories, you will have to suffice!~ At least, (bright side, anyone?) this allows us to flex our impressive weak DIY/home improvement muscles and to make some aesthetic changes to some our former choices. Now that we lived in the space, and know what we liked and didn't like so much we can adjust and hopefully make changes that will be easier to fix down the road if this ever happens again.

So, wish us luck! Anyone have any advice, tips or tricks to anythign we are about to face?

Hope the first day fall has been wonderful for all of you! 


Tuesday, February 15, 2011

New Daycare Space...

Recently, I invested in a new rug for the daycare room. We didn't want to carpet the whole room, but I was lucky enough to find a large enough rug (12'x18') to cover the majority of the 13'x18' room. There is just under 12" of wood floor along one long wall of the room uncovered...and I'm okay with that. It is covered up by furniture anyway and the kids can't trip/fall over it
And click here to see this current room at the beginning of it's life as a daycare space.

It looks bigger and feels warmer. And now, after living with it for a few weeks, it is easier to keep clean...and it's an industrial carpet, made specifically with daycares, bleach solution, throw-up, messy crafts and the like in mind. Plus, I don't feel bad when the kids crawl, lay or roll all over the floor now, since it's soft and warm and is easier to keep clean!
I do think a painting weekend is in my future...that teal with the green walls isn't doing it for me, however I plan to live with it for a bit to get a feel for what I really want this room to look like. If I paint again...I don't want to paint this room again for a LOOOOONNNNGGGG time. :)



Baby Shower...

It seems the *party du jour* to be hosting, the guest of honor, or otherwise a part of in the blogoshpere is the BABY SHOWER I, too, was part of this seeming phenomenon.




Saturday, February 5, 2011 I hosted a baby shower for my older brother & his girlfriend's bun in the oven: my soon-to-be-born brand-new nephew, Benjamin Richard. It was the mommy's wish that her family and mine work together to host this shindig and I was all for it! What a way to meet new people. Unfortunately, through no fault of anyone's, family's, mom's or baby's, the timing wasn't the best. With Christmas 3 months before the due date, it was difficult to pick a date within the "preferred" time-frame to have a shower (month 7 of pregnancy) while still bearing in mind that families have lots of stuff going on in December and expenses unrelated to baby showers during that time. I know my schedule was FULL in December. Hence the shower date of 2/5. 6 weeks after Christmas and 6 weeks before baby's scheduled arrival. First contact was made between families in September and luckily we were able to plan a lot before the holidays came, so it wasn't a huge hit on my pocket-book all at once.
Here are the details of the shower. Hosted by both Grandmas, and all four Aunts.

The invitations from Tinyprints.com


The final inspiration board. The colors were pale blue, lime/kiwi
green with accents of orange and gray.


The favors from beau-coup.com


The back-up favors. We had some issues with
UPS delivering the favors on time
(with expedited shipping no less)
so I had to throw something together last minute.

Game Prizes, also from beau-coup.com


the Benjamin banner...if you look really closely, you can make out his name.


The cake made by my mother-in-law (for free!) Love her!


Trying to tie in the invitations, the clothesline decorations.
All the outfits were gifts to mommy and baby from Auntie Jenny


"Guess Who?" A game we played. The object was to guess who was who!
Mom, Dad, Ben, or big sister!
(Mom's 16 year old daughter from a previous relationship)
Seemed tricky enough, the mom's mom got one wrong! :)


My DIY diaper cakes (tutorial found here)



The floral centerpieces. I don't know about you,
ut I LOVE me some fresh flowers at parties.
I think it livens and freshnens the whole place up!
Courtesy of Denise at FloralDecor in Palmyra

"Bet the Baby Stats"
Each guest guesses what Baby Ben's

birth date, weight, & height will be.
Entry fee was $1.00 per guess,
the prize is a 50% of the "pot." The rest goes to Ben's savings fund.

Activity of the day: Burp cloth & onesie decorating.
Using fabric markers or paints, each guest was able to decorate a onesie or a burp cloth
with various designs and words, creating a one of a kind wardrobe for baby Ben!
Unfortunately, I didn't get a chance to participate...I still have mine to do :(


Gift table set up



Beverage station: iced tea, grape punch, water, hot beverages

The food was the only part of the shower, I didn't have to do!. Thankfully, the mommy-to-be's sisters were able to help out here and with the paper products. We had Beef Barbeque, macaroni and cheese, potato salad, lunch meat tray, and a veggie & fruit tray. I didn't get any good pics of the food, and very little of the shower in progress. I'm still learning to play photographer! :)

I had a ton of fun planning the shower, and hope that the mommy-to-be had a good time, and enjoyed the fruits of my labor, so that her labor might be all she need worry about when it's time for baby to arrive!

Baby Ben was due to arrive in mid-March, but he seems to want to come early. We're now looking at 1-3 weeks away for Mr. Benjamin's arrival!!! I can't wait to meet my new nephew and see the family name pass on. Have you hosted any parties lately? Share you tips and tricks. Happy Planning!